Heraanleg Bredabaan

Project Description

The contract covered the renovation of the N1 – Bredabaan from outer wall to outer wall (including hidden sewerage pipes and superstructure)

FDP was responsible for:

  • Ensuring continuity in tram operations
  • Removing tram rails and the catenary system
  • Installing a free tram-bus lane in reinforced cement/concrete paving
  • Installing tram tracks, including the necessary track systems and points bars
  • Supplying and installing catenary system masts
  • Installing a tram info system
  • Installing 3 points operation units
  • Installing 3 lubrication installations

Project Details

  • WerfHeraanleg Bredabaan in Merksem
  • BouwheerAgentschap Wegen en Verkeer (AWV)
  • OpdrachtgeverN.V. Van Wellen
  • GebruikerVlaamse Vervoersmaatschappij De Lijn
  • PlaatsBredabaan Antwerp
  • Bedrag€ 3,887,046.96
  • Data2013 > 2014
  • SP / KR / W3,500m track - 4 crossings - 7 point switches