ITC RUBIS

Project Description

The ITC Rubis task was completed over various phases; the first phase between 2008 and 2009, the second phase during 2016.

In both phases, the following were supplied and installed:

  • Track
  • Point switches
  • Buffers
  • Crossings
  • Drainage
  • Level crossings
  • Rail supports

The connection to the Infrabel network was also created.

Project Details

  • WerfITC RUBIS
  • BouwheerITC RUBIS
  • OpdrachtgeverITC RUBIS
  • GebruikerITC RUBIS
  • PlaatsBlikken - Beveren
  • Bedrag€ 4,051,947.90
  • Data2008 – 2009 - 2016
  • SP / KR / W4,892.7m track - 16 point switches - 4 English point switches - 1 crossing - 8 buffers