Project Description
The ITC Rubis task was completed over various phases; the first phase between 2008 and 2009, the second phase during 2016.
In both phases, the following were supplied and installed:
- Track
- Point switches
- Buffers
- Crossings
- Drainage
- Level crossings
- Rail supports
The connection to the Infrabel network was also created.
Project Details
- WerfITC RUBIS
- BouwheerITC RUBIS
- OpdrachtgeverITC RUBIS
- GebruikerITC RUBIS
- PlaatsBlikken - Beveren
- Bedrag€ 4,051,947.90
- Data2008 – 2009 - 2016
- SP / KR / W4,892.7m track - 16 point switches - 4 English point switches - 1 crossing - 8 buffers