Project Description
Each year, Stora Enso Langerbrugge manufactures 555,000 tons of newspaper and magazine paper on the basis of 100% recycled paper. FDP installed the tracks in the new factory. This included the following work:
- Installation of tracks on ballast
- Installation of tracks in concrete
- Installation of tracks in asphalt
- Supply and installation of 9 point switches, including electrical controls
- Supply and installation of 9 buffer constructions
Project Details
- WerfStora Enso
- BouwheerStora Enso
- OpdrachtgeverStora Enso
- GebruikerStora Enso
- PlaatsWondelgemkaai - Ghent
- Bedrag€ 3,089,729.90
- Data2002 - 2004
- SP / KR / W3,481m track - 9 point switches